Ford WTW Inlet Works

Client Galliford Try
Contract Value Circa £200,000.00

Description of Works

HDR were contracted to carry out all Civils aspects in relation to the upgrading of the Inlet Works at Ford Water Treatment Works for Southern Water. This included:

  • Temporary Works Design and Installation of large sheet-piled cougher dam to enable connections to a 500mm & 600mm Rising Main.
  • The initial site setup including constructing of hardstanding, footpaths, designated traffic roots and service connections.
  • The construction of large concrete foundation slab and all associated drainage.

The Works were carried out while the treatment works were fully operational, this in turn created challenges throughout the project along with a developing design as works continued. However, HDR worked closely with Galliford Try and their designers to ensure the project was delivered successfully.